I walk by this every day on my way to work. Finally got around to taking a picture...

Some cleaver urban "tagger" made a keen observation about the world... and our profession in particular.

In case you can't make it out, a chunk of marble broke off this seat/light-pole footing (same thing has happened to every one on the block)... beyond the marble facade, someone wrote "Reality" on the C.I.P. Footing.

I Smile every time I walk by...

Views: 438

Attachments:

Reply to This

Replies to This Discussion

I guess it's all just lipstick on a pig...

Very funny..Looks like a portal to another world.

Maybe I'll try climbing in there on Monday and see what happens...

Wow. Is the end piece of stone glued to a 2x4?? I've seen so much stuff like this recently, mostly on public works projects.

 

This would be a quick "well, there's your problem right there."

I'll have to take another look at it but I think what you're referring to is a stainless steel L-bracket... but yeah, it was just glued to it.

Lessons Learned:
1. Smooth granite glued to smooth stainless = Fail.

2. Heavy material glued to small surface area = Fail.

3. Brittle material used near snow clearing machinery = Fail.

There are literally 5 or 6 of these on the block, all of them are broken in a similar fashion. Fail.

Thanks for the post. I'm thinkin' something along these lines would make a great recurring feature for my henceforth neglected b-log. I've got tonnes of stuff like this, and we can all get a laugh while learning something at the same time. I'll get to work on it when I have some time.

Chip happens

Nice to see you posting again Thomas.

haha... brilliant! yet sad?

seems like a problem around the globe where it's all fun and games til the inner workings are put on display.

I'm sure it will get fixed once the discussion... It's a design flaw! No Construction mistake! Bad Maintenance! ... gets worked out

Lipstick on a pig.

 

Champaign taste on a Thunderbird budget.

 

We should remember that there are lots of places in the design or in the management of the project where this bench may have gone bad. When product and budget don'y meet, some try to preserve the frosting on the cake while others might save the cake with less emphasis on the frosting. But in either circumstance, we don't know where, or more specifically, who in that process made the decision.

 

I would not conclude that this was the LA's fault nor would I conclude that it was not. One of the best projects that we did while I was in school was a critique of a built landscape where we each chose a built landcape and tried to interview everyone from the developers, to the designers, review boards, construction people, and end users. It was quite enlightening to find where and why things got to be the way they were. It is never safe to assume.

You don't think it's possible the LA detail specified 2x4 plank backing? 

I'm not ruling anything in, nor would I rule it out. ...nor do we know if an LA even worked on it.

 

RSS

New Jobs!

Members

Forum

Trump as President? Meaning for Landscape Architects? 21 Replies

Trump promises a lot of deregulation, a lot of infrastructure building, jobs, economic growth, and, he's an experienced developer... so how do you think his presidency will impact our profession? Will we see more projects coming in? Less red tape?…Continue

Tags: Trump, politics, President

Started by ida in GENERAL DISCUSSION. Last reply by J. Robert Wainner yesterday.

2017 I-Park Artists-in-Residence Program

Application Deadline: January 30, 2017
I-Park, dedicated to nurturing artists and the creative process, is pleased to announce that it is accepting applications for the 2017 General Residency Program season. Artists working in the following…Continue

Started by I-Park in PLANTS & HORTICULTURE on Thursday.

2017 I-Park Artists-in-Residence Program

Application Deadline: January 30, 2017 
I-Park, dedicated to nurturing artists and the creative process, is pleased to announce that it is accepting applications for the 2017 General Residency Program season. Artists working in the following…Continue

Started by I-Park in SUSTAINABILITY & DESIGN on Thursday.

Site Measuring Revisited Again 2 Replies

I've put up a couple of discussions in the past regarding tools and methods for site measuring to supplement a survey or for a small project. Back in November I saw the video below and decided to buy the Disto S910 because of its ability to export a…Continue

Started by Andrew Garulay, RLA in STORY BOARD. Last reply by Andrew Garulay, RLA on Wednesday.

© 2017   Created by Andrew Spiering.   Powered by

Badges  |  Report an Issue  |  Terms of Service