I walk by this every day on my way to work. Finally got around to taking a picture...

Some cleaver urban "tagger" made a keen observation about the world... and our profession in particular.

In case you can't make it out, a chunk of marble broke off this seat/light-pole footing (same thing has happened to every one on the block)... beyond the marble facade, someone wrote "Reality" on the C.I.P. Footing.

I Smile every time I walk by...

Views: 438

Attachments:

Reply to This

Replies to This Discussion

I guess it's all just lipstick on a pig...

Very funny..Looks like a portal to another world.

Maybe I'll try climbing in there on Monday and see what happens...

Wow. Is the end piece of stone glued to a 2x4?? I've seen so much stuff like this recently, mostly on public works projects.

 

This would be a quick "well, there's your problem right there."

I'll have to take another look at it but I think what you're referring to is a stainless steel L-bracket... but yeah, it was just glued to it.

Lessons Learned:
1. Smooth granite glued to smooth stainless = Fail.

2. Heavy material glued to small surface area = Fail.

3. Brittle material used near snow clearing machinery = Fail.

There are literally 5 or 6 of these on the block, all of them are broken in a similar fashion. Fail.

Thanks for the post. I'm thinkin' something along these lines would make a great recurring feature for my henceforth neglected b-log. I've got tonnes of stuff like this, and we can all get a laugh while learning something at the same time. I'll get to work on it when I have some time.

Chip happens

Nice to see you posting again Thomas.

haha... brilliant! yet sad?

seems like a problem around the globe where it's all fun and games til the inner workings are put on display.

I'm sure it will get fixed once the discussion... It's a design flaw! No Construction mistake! Bad Maintenance! ... gets worked out

Lipstick on a pig.

 

Champaign taste on a Thunderbird budget.

 

We should remember that there are lots of places in the design or in the management of the project where this bench may have gone bad. When product and budget don'y meet, some try to preserve the frosting on the cake while others might save the cake with less emphasis on the frosting. But in either circumstance, we don't know where, or more specifically, who in that process made the decision.

 

I would not conclude that this was the LA's fault nor would I conclude that it was not. One of the best projects that we did while I was in school was a critique of a built landscape where we each chose a built landcape and tried to interview everyone from the developers, to the designers, review boards, construction people, and end users. It was quite enlightening to find where and why things got to be the way they were. It is never safe to assume.

You don't think it's possible the LA detail specified 2x4 plank backing? 

I'm not ruling anything in, nor would I rule it out. ...nor do we know if an LA even worked on it.

 

RSS

Members

Forum

What other services does your design firm offer besides LA? 5 Replies

What other services does your design firm offer besides LA? Graphic Design? Marketing? Landscape Photography?I dream of going out on my own one day. What other similar services can I add to my future company to produce more income so it does not…Continue

Started by BennettSmithhart in PROFESSIONAL PRACTICE. Last reply by Andrew Garulay, RLA 6 hours ago.

Augmented Reality 5 Replies

Are any firms or designers using augmented reality to present design concepts in the field?

Started by ZACH CROSS in PROFESSIONAL PRACTICE. Last reply by Andrew Garulay, RLA 6 hours ago.

Salary 4 Replies

Hello folks,I'm wondering if someone can offer me any insight into how much of a pay increase I should push for following the completion of my PLA licensure?  I'm thinking 10-15%.Thanks,BrandonContinue

Tags: Salary

Started by Brandon Herman in PROFESSIONAL PRACTICE. Last reply by Brandon Herman on Friday.

Freelance Landscape Design 6 Replies

I am wanting to do some freelance landscape design on the side. Do I handle finding the contractor or do I just give them the final plans? Do customers really want the plans or a final built product?BennettContinue

Started by BennettSmithhart in GENERAL DISCUSSION. Last reply by Dave McCorquodale Jun 23.

Videos

  • Add Videos
  • View All

© 2016   Created by Andrew Spiering.   Powered by

Badges  |  Report an Issue  |  Terms of Service