Scenario: low to high flow creek along side of the road. At high flow severe erosion has started to undermine the roadway as well as weaken the guardrail structures. Deltalok USA was specified as the only option available for the emergency erosion repair. 100′ of creekbank will be temporarily repaired before winter hits in the Midwest. A full creek lining of 1200 feet will be installed in 2010 for a permanent vegeatated repair solution.
http://www.deltalokusa.com