Daniel Phillips

Forum Replies Created

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #151957
    Daniel Phillips
    Participant

    Also-does anyone have any specific feedback on the sub-irrigation system?  I’m hoping to get them at least 6″ deep with an overflow near the top of that.  I’m wondering if it’s necessary/ideal to have them directly under the root ball or if it’s ok/better to slightly offset.  Any insight would be very helpful. 

    Best,

    Daniel

    #151958
    Daniel Phillips
    Participant

    Thanks Robert, 

    I appreciate your insight as well.  We are in the process of getting some material quotes at the moment that will certainly impact the scale/approach.  We are thinking of going with Ginkgo trees (hopefully three)  with an initial trunk diameter of about 6″ and a canopy of 8′.  The total volume of soil is approx 3-4,000 cu. ft.  

    Your idea of the mortar sacks is also interesting.  Beyond the increased structural stability, do you suppose those are any cheaper than the sand bags?  

    #151960
    Daniel Phillips
    Participant

    Thanks so much Mark, this project is in Rome, IT with a slightly different regime for the marking of utilities (everything is mired in bureaucracy).  Your point about depth/footprint is well taken. Looking forward to making progress. 

    Glad to find this forum!

    Best,

    Daniel

Viewing 3 posts - 1 through 3 (of 3 total)

Lost Password

Register