I’ve seen this done by using slurry over sand bed system, in turn over concrete. The setting is 3 parts masonry sand and 1 part portland. The slurry is 1/2 bag of portland for 5 gal of water. Use acid/brick wash to clean efflourescence/surface mortar 3 days after install.
Never having actually done it myself, I would probably hire a contractor to see how to do it. It’s more than just following directions, as there are “finess” to a stone install. You can try to find a how-to book or two at your local B&N or Borders for visual reference.