Thanks for starting this thread, Eric.
In the LARE Orientation Manual (June 2012) there is information on fasteners, reinforcing, materials, lumber / timber, and wood member sizing — but there are listed as necessary for Section *4* — not 3.
However, CLARB’s Section 3 topic list indicates we should “investigate, verify availability, and select design materials and components” as part of Section 3, so now I’m confused. The Section 4 topic list indicates the need to prepare construction details, but doesn’t give more detail beyond that.
It’s hard to understand how the material from Section D is now being divided between Sections 3 and 4.