Reply To: Site Survey Equipment

#160656
Steve Mercer
Participant

I have to say that hiring a good salesperson to run interference for you would be a better approach.  And if you were using a Robotic Total Station you would be on-ste (depending on the size and scope of the job) 2 to 6 hours as opposed to 2 days.  By the time you got the data back to the office the site-work drawing would be complete and you would be ready to start designing the landscape.  You could be spending the time you saved from those two job functions  to actually do more design work that your salesman would be sending to you.

 