Adam Quear

  • John Galbavy posted an update in the group Group logo of Green StreetsGreen Streets 13 years, 1 month ago

  • John Galbavy posted an update in the group Group logo of Green StreetsGreen Streets 13 years, 1 month ago

    Here is some pics from the project I described below- this was from 3 months ago and is coming along nicely. Note the re-used granite that we incorporated from existing curbs on the street. The sidewalk is alternating concrete broom finish and shell agreggate wash.

  • vc hefti posted an update in the group Group logo of Green StreetsGreen Streets 13 years, 2 months ago

    Greet links, they helped a lot on a recent project. Thanks!
     

  • Section E LARE Review in North Carolina
     
    Date/Time: May 13-15, 2011 (25 hours)
     
    Description:
    Through lecture, group discussion, and practice exercises, this intensive three day course focuses on preparing students to take Section E: Grading & Drainage of the Landscape Architects Registration Examination. The course includes a look at how the p…[Read more]

  • Thanks for your photos Chris.  Deadrick street looks great!
    Kevin– yes, we are installing planters over storm inlets. 
    Any feedback is appreciated.

  • Date change to Saturday May 7, 2011 for LARE Review Study Session – Section C & E in Baton Rouge, LA.
    See post below on April 1 for all other information (time, place, fee, contact, etc.)

  • LARE Review Study Session- Section C & EThe Louisiana Chapter ASLA is hosting review sessions for the upcoming LARE exam for sections C&E on Saturday, April 9 from 8:30 am to 3:45 pm at the Shaw Center for the Arts, 2nd Floor, located at 100 Lafayette Street, Baton Rouge, LA.The session is taught by Matt Mathes, ASLA, PPI Author LARE study…[Read more]

  • What is the grade and the largest amount of water you are dealing with? The planter needs to be designed to handle whatever nature throws at you.  You can retrofit the drain like Chris said to become the overflow at the down end of your planter. If you have a lot of slope, check dams can hold the water and pool it to infiltrate fully. Then the…[Read more]

  • Are you talking about installing a planter over a storm inlet, or a storm line? 

  • We are designing stormwater bioretention planters for a downtown.  We want to place a planter where a storm drain currently exists.  Can a planter be designed over a storm drain and be an effective bioretention measure — i.e. slowing down rainwater but not completely infiltrating?  Appreciate any input.

  • I just took section A. I thought it was on the Legal and Administrative Aspects of Practice. Little did I know that I was going to be tested on concrete test and what trash to recycle on the job site…..as a matter of fact I don’t remember seeing one question on bidding or the process or contract…Thanks CLARB for making me study crap that has…[Read more]

  • John, thanks for sharing.  Do you have any site photos, from these projects, that you’re able to post here?

  • John Galbavy posted an update in the group Group logo of Green StreetsGreen Streets 13 years, 5 months ago

    If anybody here has done any public work involving raingardens in Florida let me know! Since I have been working for my firm here in Tampa we have completed 4 to 5 significant “raingarden” type projects; one of them being a LAP FDOT streetscape for Tarpon Springs. Public work involving stormwater management in a creative way is far and few…[Read more]

  • marcial andan flores posted an update in the group Group logo of DESIGNDESIGN 13 years, 6 months ago

    hello guys…
     
    glad to join the group.

  • Let me just add to my last with a couple of tidbits. Don’t worry about taking all the tests at once. I have not noticed a lot of overlap – each section almost entirely pertains to its stated material. Frankly, I think folks that say “that test had nothing but section # material on it!” likely did not prepare long enough to know that they were be…[Read more]

  • I’ve posted a notice for my upcoming LARE ABD Workshop in January under the events section of this site.
     
    Ray

  • You’re welcome. I hope it helps. I’m using this method now to study for Section B.

  • I’ve taken two of the three multiple choice exams and passed those two the first time using the following method. I wrote a blog entry somewhere on this site expanding on this method but here it is in a nutshell: It may seem strange at first but it works – apparently. You should know I have no LA degree so I had even that much more of a hand…[Read more]

  • I might suggest that taking A&D at the same time might be a good approach as well. There was quite a bit of material that seemed to overlap on the 2 tests…might as well study it all at once!
     
    I took all 3 at the same time. It is indeed doable if you follow Ray’s suggestions. I spent about 6 weeks studying intensively…an hour or two every…[Read more]

  • Taking all 3 multiple choice tests at the same time is doable, but a lot depends on the individual.
    Are you over-worked? (Sadly those employed generally are, due to the “attrition” the profession has experienced)
    Do you have kids, significant others, sick parents, do a lot of onerous volunteer work?
    How focused are you at test preparation?
     
    If…[Read more]

  • Load More

Lost Password

Register